Elettra-Sincrotrone Trieste S.C.p.A. website uses session cookies which are required for users to navigate appropriately and safely. Session cookies created by the Elettra-Sincrotrone Trieste S.C.p.A. website navigation do not affect users' privacy during their browsing experience on our website, as they do not entail processing their personal identification data. Session cookies are not permanently stored and indeed are cancelled when the connection to the Elettra-Sincrotrone Trieste S.C.p.A. website is terminated.
More info
OK

Ramping up the channelplate

In normal operations, when you turn on or off the detector, take care NOT to have a difference of more than 5 kV between MCP and SCREEN.
The following conditioning procedure is to be followed only after venting and bake-out.

  1. Apply voltage to the phosphor screen (Va) in +250V, 1 minute increments. Stop at +1.0 kV.

  2. Apply voltage to the channelplates (Vo) in +100V, 2 minute increments. Stop at + 1.0 kV.

  3. Increase the voltage to the phosphor screen (Va) in +100V, 5 minute increments to +3.0 kV. Wait 5 minutes.

  4. Increase the voltage to the phosphor screen (Va) in +100V, 10 minure increments to +4.0 kV. Wait 5 minutes.

  5. Simultaneously increase the voltage to the phosphor screen (Va) and to the channelplates (Vo) in +100V in 10 minute increments to +4.5 kV at Va and +1.5 kV at Vo.

  6. Increase the voltage to the phosphor screen (Va) in 10 minute increments to +5.5 kV.

  7. Optional. Simultaneously increase the voltage to the phosphor screen (Va) and to the channelplates (Vo) in +50V, 10 minute increments to +6.5 kV at Va and +2.0 kV at Vo.

Total time about 6 hours.