General plan

MagStaff+LaserGroup staff takes care of:

  • the transport of 2 mJ to the magnedyn board
  • the transport of to the sample
  • reference samples placement

Proposers:

  • deliver a OPA+DFG board (the board can be redesigned according to needs free space at least 40x80 cm)
  • OPA+DFG diagnostics
  • final sample

Proposers+MagStaff+Padres:

  • RIXS optimization (during BT)
  • SLU - OPA+DFG coupling (1/2 weeks in advance)
  • DGF - chamger coupling (1/2 weeks in advance + material)
  • t0 (during BT)
  • intensity control (1/2 weeks in advance + material)

ACTIONS:

  • ask proposers if the general plan is ok
  • ask Cavalleri if the OPA+DGF can be used by Bossini (at 5 um)
  • define motorized optical elements
  • is Nitrogen purging good option to avoid attenuatio of DFG?
  • define "material needed" (see below) for the experiment
  • buy IR vacuum window (15-5 um)
  • prepare N2 purge system
  • intensity control (wp S?)

Material needed for Mag:

  • 5/6 ps compressor on MagBoard
  • vacuum window 15+5 um
  • N2 purge system
  • lens/spherical mirror
  • small compressor Miltcho