Elettra parameters
Pagina 1 di 4
Elettra is operated 24 hours/day, 7 days/week for some weeks followed by periods of intermission mostly dedicated to maintenance. These operation periods are called "Runs". Beamtime is allocated in "shifts" of 8 hours which are divided in Morning (M) from 07:00 a.m to 15:00, Late (L) from 15:00 to 23:00 and Night (N) from 23:00 to 07:00. Some beamtime is reserved to Machine Physics studies but most of it is allocated to users for measurements activities at the beamlines.
Elettra is usually operated at two different energies 2 GeV and 2.4 GeV.
Details on:
- beamtime allocation calendar
- current Run schedule
You can check the ring present status at the link machine status and also have a look at its operating parameters and conditions.
ODAC is the acronym of the project: Operations and Development of the Accelerators.Energy range | 0.75 – 2.5 GeV |
Injection Energy | All energies up to 2.5 GeV |
User Operating Energy |
2.0 GeV (75% of user time) 2.4 GeV (25% of user time) 1.0 GeV (SR-FEL) |
Operating mode | Top-up |
Operating current (user request) |
300 mA at 2.0 GeV (lifetime 26 h) 140 mA at 2.4 GeV (lifetime 40 h) |
Top-up injection rate |
1 mA every 6 min at 2.0 GeV 1 mA every 20 min at 2.4 GeV |
Filling pattern | Any (single, few, multi etc.); most requested multibunch filled at 95% of the ring circumference (864 ns) and hybrid ( multibunch with a single bunch in the dark gap ) |
Bucket size (bunch to bunch distance in multi-bunch) | 2 ns |
Dark gap when fill at 95% | 43 ns |
Operating details |
Long Lifetime - Instability Free (multi-bunch and orbit fast Feedbacks and super-conducting 3rd harmonic cavity operating) Id gap/current control to the users |
- Prec
- Succ >>
Ultima modifica il Lunedì, 26 Ottobre 2020 15:24