News Archive

Official opening for the new LB building

0001_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0005_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0007_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0013_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0014_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0018_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0019_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0020_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0040_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
0044_2025.03.17-Elettra-Fedriga_Ph-Massimo-Goina
01/10 
start stop bwd fwd

On Monday, March 17, the President of the Friuli Venezia Giulia Region, Massimiliano Fedriga, visited Elettra Sincrotrone Trieste, where he attended a presentation by Alfonso Franciosi, President and CEO of the center, and officially cut the ribbon of the new LB building. During the visit, Fedriga explored the magnet characterization laboratory, a key facility within the Elettra 2.0 project, the next-generation synchrotron designed to deliver superior performance with reduced energy consumption.

The meeting highlighted the growing challenges posed by rising energy costs, which have led to a 40% reduction in the operational capacity of Elettra and FERMI since 2022, impacting scientific output and researcher access. To address this issue, Elettra has presented a proposal to the Regional Government and the Ministry of University and Research (MUR) for a high-efficiency photovoltaic plant to be built in a nearby quarry area. The 9-megawatt solar park will feature bifacial panels to maximize energy capture and will be directly connected to the research center via an underground medium-voltage cable. This initiative is expected to reduce operational costs and cut CO₂ emissions by over 120 million kg over 30 years, equivalent to the absorption capacity of 132,000 trees.

The commissioning of Elettra 2.0, scheduled for 2026, could further benefit from the photovoltaic plant, ensuring full operational capacity for both infrastructures and revitalizing research activities.

Here below the press review

  • GR RAI FVG dd 16.03.2025 Visita a Elettra Sincrotrone Trieste avi
  • TGR FVG dd 16.03.2025 Il Presidente della Regione Fedriga visiterà la sede del Sincrotrone avi
  • TriestePrima.it dd 16.03.2025 Ricerca - Fedriga: Elettra2.0 infrastruttura di livello mondiale pdf
  • TGR FVG dd 17.03.2025 Fotovoltaico per Elettra2.0 avi
  • TriesteAllNews.it dd 17.03.2025 Fedriga: Elettra2.0 infrastruttura di livello mondiale pdf
  • IlNordestQuotidiano.it dd 20.03.2025 Elettra Sincrotrone 2.0 infrastruttura di livello mondiale nello studio della luce pdf
Last Updated on Friday, 21 March 2025 11:28