Pumping and pressure reading
Page 4 of 6
Preparation chamber - top
No turbomolecular pumpThis chamber is pumped through preparation chamber - bottom (CF100 gate valve) or load lock (CF38 angle valve).CryopumpHelps removing water vapours from the residual gas. Refill with LN2 approx. every 60 minutes. After use blow out LN2 and humidity using compressed air for several hours. During thawing there will be high peaks on the pressure in the chamber (10-6 mbar). Rotary vane pumpfor pumping of the Θ rotary feedthroughs of the manipulatorsIt must be vented after switching off! For short periods you can just close the valve on the line and leave the pump on. (manual ) |
Full range gaugecontrolled by MaxiGauge controller in the left experimental rack, channel 2switch channels long press for switch on long press for switch off (manuals sensor controller ) |
Last Updated on Thursday, 19 October 2023 10:08